Learn more about any general improvements, lifecycle changes, and issues addressed in this ArcGIS Solutions release.
General improvements
Address Data Management- A new tool used to define the spatial reference of the schema only file geodatabase included in the Address Data Management project.
- Updated the Communications Data Manager project stylx file and group templates.
- A new Problem Identification ArcGIS Pro project that adds support in the Weighted Displacement Difference tool for evaluating small to zero displacement distances.
- A new Law Enforcement Data Management ArcGIS Pro project.
- A new Crime Reduction Statistics ArcGIS Pro project which resolves an issue in the Generate Incident Statistics tool where summary statistics for the first value in the category 2 field were not calculating.
- A new Law Enforcement Data Management ArcGIS Pro project.
- A new Daily Crimes Dashboard and Daily Calls Dashboard replaces the Daily Activity Dashboard.
- A new Law Enforcement Data Management ArcGIS Pro project.
- A new Fire Incident Dashboard that resolves an issue with gauge elements.
- A new Flood Impact Analysis ArcGIS Pro project to support ArcGIS Pro 3.2.
- Added Unified Pipeline Tools add in included in solution.
- Changed the field diameterspecification to fittingspecification.
- Additional codes added to a series of domains.
- Service Station Asset Group added to PipelineDevice.
- Olet Asset Group added to PipelineJunction.
- Storage Facility Asset Group added to PipelineAssembly.
For a full list of updates, refer to the change log.
- Updated the Gas Data Manager project to fix the Steel Service with EFV group template.
- A new HUD Report notebook that resolves an issue in which the survey records for Asian American and American Indian or Alaskan Native were not being calculated accurately (BUG-000157330).
- Reference documentation topics for this release
- Updated Delete All Features From Workspace tool to work on supported previous versions of ArcGIS Pro.
- Sample data included for both MIL-STD-2525B w/Change 2 and MIL-STD-2525D.
- A new My Neighborhood Services app using Nearby Instant Apps.
- A new My Neighborhood Services map with updated basemap and symbology.
- An updated 'Version' table name.
- A new Plan Catalog Instant Apps app.
- A new Plan Index Instant Apps app.
- A series of new Plans and Drawings maps.
- A new Law Enforcement Data Management ArcGIS Pro project.
- A new Public Notification map with updated pop-ups to support related records.
- A new Public Notification app with updated search zoom levels.
- A new Special Event Command Center app updated with a new National Weather Service radar layer.
- A new Special Event Operations Notebook.
- A new Copy Previous Site and Operations Maps notebook.
- A new Special Event Manager.
- Reference documentation topics for this release
- A new Special Event Command Center app updated with a new National Weather Service radar layer.
- A new Special Event Operations Notebook.
- A new Copy Previous Site and Operations Maps notebook.
- Updated Sun Position and Hillshade tool syntax to work with supported versions of ArcGIS Pro.
- A new Tax Sale app using the Basic Instant App.
- A new Tax Reverted Property Dashboard app with colors and accessible name for each element.
- A new Field Maps map with form.
- New maps with updated basemaps and symbology.
Lifecycle changes
Help documentation for solutions moved to the Mature lifecycle phase can be found on the Archived help page.
- Coronavirus Business Continuity has been moved to the Mature lifecycle phase.
- Coverage Processing has been moved to the Mature lifecycle phase.
- Shelter Locator has been moved to the Mature lifecycle phase. Capabilities have been replaced by Emergency Management Operations.
- Neighborhood Early Warning has been moved to the Mature lifecycle phase. Capabilities have been replaced by Neighborhood Stabilization.
- Service Qualification has been moved to Mature Lifecycle Phase.
- Racial Equity Community Outreach has been moved to the Mature lifecycle phase. Capabilities have been replaced by Social Equity Analysis.
- Warming and Cooling Centers has been moved to the Mature lifecycle phase. Capabilities have been replaced by Emergency Management Operations.
- Water Outage has been moved to the Mature lifecycle phase.
- All solutions for ArcGIS Enterprise 10.5–10.9 have been moved to the Mature lifecycle phase. Users may continue to use any previously deployed solution.
- The ArcGIS Solutions Deployment Tool has been moved to the Mature lifecycle phase. Solutions are available in the ArcGIS Solutions app.